[18-June-2013 6:00-7:00pm] Standalone License Server EMPOWER Offline

06/18/13

« Back

CCIT needs to take down the standalone license server "EMPOWER" for maintenance to replace the workaround for a failed USB hub servicing the license hardware keys. The maintenance will start at 6:00pm Tuesday, June 18th 2013, and is expected be back up by 7:00pm that evening.

NOTE: This will not effect licenses hosted on the redundant cluster (enable/entitle/entrust or license.mines.edu).

The affected licenses include:
FlexLM Based:

  • PRA BasinMod
  • MAPTEK Vulcan
  • Fugro-Jason PowerLog
  • Palisade Decision Tools
  • IHS Petra
  • Schlumberger Petrel
  • KAPPA Ecrin
  • IKON RokDoc
  • GeoChemist Workbench
  • SMT Kingdom

RLM Based:

  • AnyBody
  • CMGL
  • Runge
  • TecPlot

Other Hardware Keys:

  • ArgusPC
  • Spartan
  • SKM PowerTools
  • VnetPC
  • BR&E ProMax
  • SurPAC
  • Minesight
  • C-Tech
  • Aquaveo
  • ZEMAX
  • AspenTech
  • RISA
  • PSIM
  • Hydrus
  • GOHFER

Other Non-Standard Licenses:

  • Altair HyperWorks
  • Eviews
  • Mimics
  • NAG
  • Interactive Petrophysics
  • RocScience
  • LOOP-PRO

If you have questions, please contact CCIT via Mines Help Center

-- CSM CCIT Infrastructure Group

«  December 2014  »
S M T W T F S
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31      

News (12/17/14)

[3-Jan-15 8:00 AM - 7:30 PM] Campus Wide Service Outage

  • On Saturday, January 3rd CCIT will perform annual maintenance on the institution’s core networking infrastructure. The planned work requires that

Maintenance Notices

Routine and preventative maintenance which involve service interruptions are posted here.  Please bookmark this page!